$28M Assembly Square housing tax break heads to public hearing

Somerville Finance Committee meeting ·

AI-generated summary: This summary is AI-generated. Confirm important details in the original video and official minutes.

Items Discussed

Block 9 Assembly Square housing tax break (UCH-TIF) – Kept in committee; public hearing Dec. 8

The administration presented a proposed Urban Center Housing Tax Increment Financing agreement with Federal Realty for Block 9 (375 Harold Cohen Way, next to the TransMedics building), a fully permitted but stalled project of 318 apartments, 13,000 square feet of ground-floor space intended for childcare, 64 affordable units (the full 20% inclusionary requirement), and two of those units set at 30% of area median income—deeper than the ordinance requires. Executive Director Tom Galligani framed it as the alternative to weakening inclusionary zoning: "The city council told us clearly that weakening our 20% requirement is a nonstarter," while Chelsea, Boston, Waltham and Malden have gone the other way.

Key terms, per planner Katherine Wiese and consultant Barry Abramson:

  • The vacant lot now generates about $80,000 a year in taxes. The 20-year agreement would begin 24 months after a building permit is pulled (targeted for late 2027), with full taxes paid on the partially built value during construction and about $3 million in building permit fees up front.
  • Years 1–10 would yield roughly $500,000 a year (an exemption of roughly 80% on the increment); years 11–20 would ramp up to an average of nearly $2 million a year. Total collected over 20 years: about $26 million; total forgone: about $28 million.
  • An "excess profit adjustment" would send the city all returns above a cap set at 200 basis points over the 10-year Treasury rate (escalating 2.5% a year). Abramson estimated rents just 5% above projections could yield the city a few hundred thousand dollars a year; he said he knows of no other TIF with a clawback this strong.
  • Hard construction cost is estimated at $117 million; total project cost about $171 million.

Councilor JT Scott praised the drafting but pressed on the scale of the subsidy, calculating that $28 million against a $171 million project resembles a 15–17% equity stake without equity-like returns, and noted the planning board already waived a traffic study, parking requirements, and any right of first refusal. Abramson responded that on a present-value basis the forgone taxes are closer to $12 million, or about 7% of project cost, and that the 299 Broadway TIF was a 100% exemption for 20 years, versus roughly 80% here. Scott asked staff to report how long the May 2025 special permit remains valid and whether any side agreements were signed; Galligani agreed to follow up. Scott contrasted this with 299 Broadway, which subsidized a roughly 50% affordable project, and said the council's and voters' appetite for subsidizing a standard market-rate project is "an open question."

Councilor Jonathan Link called it "essentially a handout" but said the greater risk is the site sitting empty, noting the city also receives permit and linkage fees. Chair Ben Wheeler said he is leaning toward trusting staff's conclusion that the project does not pencil without the incentive, but flagged concern about setting a precedent for other developers. Housing Stability Director Ellen Shachter said nearly 80% of Somerville Housing Authority applicants are below 30% AMI, 581 Somerville families are on the federal public housing wait list with about eight placed per year, and no new 30% AMI units are being created outside purpose-built affordable projects. Housing Director Lisa Davidson stressed the city is "still getting our 20%."

Staff flagged a memo error: a reference to using linkage fees for a third 30% AMI unit should have been stricken and a corrected version will be posted. Abramson summed it up: "I hate to see cities give away money that they don't need to," but called the decision a policy judgment on whether housing now is worth the bet.

Police Municipal Road Safety Grant ($60,313.17) – Kept in committee

This annual state grant funds police overtime and outreach. Director Emily Wisdom broke down the award: $29,509.88 for traffic enforcement campaigns (distracted driving, Click It or Ticket, summer speed and impaired driving); $16,840.30 for pedestrian and bicyclist enforcement overtime; $6,408.45 for helmets, armbands and bike lights; and $7,554.54 for outreach at Carnival, fireworks, National Night Out and community path pop-ups. Scott noted the only reduction from the $65,000 application came from vehicle enforcement.

Link recalled an outstanding order (26-1475, sponsored by Link, Sait and Wheeler) asking the police chief to appear on this grant, which sits unscheduled in the Traffic and Parking Committee. He described a July email about a cyclist in Union Square stopped and yelled at until "crying," and said he is not convinced the enforcement does "much more than harassing people" without safety gains. Scott, who said he has seen this grant nine times, stated "I am committed to voting no on this item," citing a pattern of commitments not to target cyclists followed by the same behavior; he said the council rejected the grant in 2022. Wheeler described observing a stop of an immigrant cyclist last December who feared for his status over a written warning, and said the gap between the grant's text (which acknowledges Idaho stops) and officers' practice concerns him.

Lt. Michael Holland said officers wrote about six bicycle citations last year, all written warnings, and that enforcement focuses on driver violations endangering vulnerable users (dooring, parking in bike lanes, passing too closely); he acknowledged Idaho stops remain illegal in Massachusetts but are not a priority. Councilor Kristen Strezo said she supports the grant, noting seniors' complaints about cyclists, and asked that the chair be consistent about keeping items in committee at other councilors' requests; Wheeler agreed. Wisdom said holding the item a month would not jeopardize the funds. Holland invited councilors to send specific questions in advance.

Community Preservation Act appropriations (10 items) – Recommended 4-0

All items reflect Community Preservation Committee awards for this year's funding round. Director Alan Inacio summarized:

  • Kennedy Schoolyard, $1,000,000 (plus a matching $1M transfer from the undesignated fund balance to the Open Space Reserve, which Inacio said is coincidental—the transfer funds all FY27 open-space awards). The added cost on this roughly $3 million project came from heavily customized accessible play equipment, inflation, and an unforeseen buried building foundation where the stormwater system was to go. Wheeler asked for a breakdown of playground-feature costs before the council meeting; Link asked why the landscape/hardscape line decreased. Inacio will get both answers from the project manager.
  • Spring Street traffic island, $45,000 for design of a pocket park—the first community-led open-space project of its kind. CPA Manager Roberta Cameron explained neighbors can submit ideas via the CPA intake form and be paired with a sponsoring city department.
  • Veterans Cemetery, $38,000 for lead-paint remediation of a historic fence discovered during last year's restoration.
  • Mission Church of Christ, $25,000 and Somerville Armory, $109,000 for condition assessments ahead of future historic restoration requests.
  • Elizabeth Peabody House: $230,171 for exterior restoration, $23,418.40 (with a matching transfer to the Historic Preservation Reserve) and repurposing $15,154.25 from a FY25 siding grant to address structural needs uncovered during construction.

Mobility grants: Union Square Plaza ($500,000 HUD) and Broadway/Magoun Square ($350,000 EOED) – Recommended 4-0

Director Brad Rawson said the federal earmark supports Phase 1 of the Union Square streetscape plan, focused on the Prospect/Webster intersection (at 25% design, $15 million projected budget), and is coordinated with MassDOT's bridge project, which will square off the Newton Street intersection. The state grant supports the Broadway/Magoun Square complete streets project (80% design, proposed roundabout), to be bid this winter with construction possibly starting next summer. Strezo pressed on Magoun Square business concerns about access and parking; Rawson said feedback from a month-long engagement period will be synthesized into a public report and an updated design in January, and agreed to follow up one-on-one. Link said congestion, not parking, is what keeps people away from the square.

Salary adjustments ($12,075 and $25,950) – Recommended 4-0

CAO Kimberly Wells explained the first item raises or regrades six nonunion positions that absorbed extra duties after the FY27 reorganization and layoffs; the listed amounts are half-year figures. Scott confirmed the sums double on an annual basis. The second, from Director of People Operations Anne Gill, corrects grading errors from the 2023 compensation study for two civilian police positions (victim witness advocate and senior crime analyst) and includes retroactive pay; Wells said this closes out remaining compensation-study corrections.

Routine items – Recommended 4-0

  • Two $50,000 state agriculture grants for the Mobile Farmers Market and school-based food markets (Director Lisa Robinson said they also extend the CARi card program).
  • $48,000 MassDEP recycling grant, including $12,000 for four more food-waste drop-off bins; Manager Alexander Cherry reported over 2,000 pounds collected in the first three weeks, with seven bins now emptied twice weekly.
  • Time-only extension of the D3 Logic water/sewer billing contract to June 30 to align with the fiscal year; the contract ceiling rises within the 25% procurement rule using budgeted funds. Link and Wheeler noted the "time-only" label was confusing since money is involved.
  • First amendment to the 74 Middlesex Avenue easement, adding a landscape management plan; no financial impact.
  • October 28 minutes accepted without corrections.

Note: the clerk's final roll call recorded four yes votes (Link, Strezo, Scott, Wheeler) with Councilor Hardt absent; the official record lists "5 in favor" but names only those four.

What's Next

  • All recommended items go to the full council (meeting date not stated).
  • Block 9 UCH-TIF stays in committee for a public hearing at the December 8 Finance Committee meeting, followed by a vote. Staff owe: special permit expiration and any side agreements (Galligani), and a corrected memo (Wiese).
  • The police road safety grant stays in committee; Wheeler will gather written questions for the department and hopes to pair discussion with the pending order for the chief to appear.
  • Kennedy Schoolyard: playground equipment cost breakdown and explanation of the reduced landscape line, from the project manager via Inacio, before the council meeting.
  • Magoun Square: updated design and engagement report expected in January; Rawson to brief Strezo.
  • Two or three more CPA awards from the November round will come to the committee in December or January.